Estimate charging costs for an electric car or a trip, including charging losses separately from battery energy demand.
Battery energy = distance × kWh/100 km / 100. Grid energy = battery energy / (1 − loss percentage/100). Cost = grid energy × rate.
A 200 km drive at 18 kWh/100 km requires 36 kWh in the battery. With 10% charging loss, 40 kWh come from the grid; at €0.30/kWh, it costs €12.
Public charging stations may charge session, time or idle fees. This calculator includes only the entered energy rate.
This calculation is an estimate. Check your actual contract terms and costs.